Pressure Equipment Directive: duties for non-EU makers

Share this article

WhatsAppLinkedIn

Published on

The Pressure Equipment Directive sets the product rules, and in the Netherlands the Warenwetbesluit drukapparatuur 2016 makes you, as manufacturer, answerable for them, also when you sit outside the EU and sell through a Dutch importer or customer. At MAAK Advocaten in Amsterdam we review your file, your supply terms and your role in the chain before a Dutch customer or authority asks for proof.

In short

  • In the Netherlands you, as manufacturer, must follow the category, conformity assessment, declaration and CE marking rules of Directive 2014/68/EU (Articles 6, 13, 14, 17, 19).
  • The category decides the route: none for category I, a notified body in every procedure from category II (Article 14(2)).
  • Instructions must be in Dutch and the declaration in Dutch or English; the Dutch user must have designated equipment inspected before first use.
  • Have a Dutch product law lawyer review your file and contracts before your first delivery to a new customer or when an authority asks.

Part of our overview of machinery and electrical product rules in the EU and of EU product law.

Does the Pressure Equipment Directive apply to your product?

The Pressure Equipment Directive (PED) applies to the design, manufacture and conformity assessment of pressure equipment and assemblies with a maximum allowable pressure PS above 0.5 bar, unless Article 1(2) excludes them (Directive 2014/68/EU, Article 1(1)).

Article 1(2) excludes, among others, simple pressure vessels under their own Directive 2014/29/EU, aerosol dispensers, ships and aircraft, and machinery where pressure is not a significant design factor. Whether your pump, compressor, boiler or installation is covered needs a check per product.

The directive places no duty on a company itself; the Dutch rules that implement it do, with a second layer for the user (English names are our own translations).

LayerInstrumentWho must act
ProductDirective 2014/68/EU and the Warenwetbesluit drukapparatuur 2016 (Commodities Act Decree on pressure equipment), chapter 2manufacturer, representative, importer, distributor
Use in the Netherlandssame Decree, chapters 3 and 4 (Articles 17a and 21 to 27)the user (often your Dutch customer)

Who must do what, and who is your operator in the Union?

You, as manufacturer, design, assess, declare and mark the product. Your operator in the Union is your importer, an authorised representative with a written mandate or, if there is neither, a fulfilment service provider.

RoleMain dutyDirective article
Manufactureressential safety requirements, technical documentation, conformity assessment, declaration, CE; keep papers 10 years6, 13, 14, 17, 19
Authorised representativeoptional; written mandate; not Article 6(1) or the technical documentation7
Importeronly compliant equipment; checks procedure, documents, CE, Dutch instructions8
Distributordue care; checks CE, documents9
Importer or distributor selling under own name or brand, or modifyingtreated as manufacturer10

In the Netherlands your duties apply through the Warenwetbesluit drukapparatuur 2016 (Article 4). Regulation (EU) 2019/1020 lets this equipment onto the market only if such an operator established in the Union performs the tasks in Article 4(3) (Article 4(1), (2) and (5)). The directive only says you may appoint an EU authorised representative in the Netherlands (Article 7(1)).

What manufacturers outside the EU most often get wrong is thinking the Dutch partner can arrange the PED file for them. That is not possible: design, manufacture and the technical documentation belong to you as manufacturer and are outside an authorised representative’s mandate (Articles 6 and 7(1)). Discuss the role with your Dutch partner in advance and put it on paper. With one Dutch importer, one point of contact is simplest; a separate authorised representative suits you better if you supply several importers or webshops directly.

Note: Your Dutch importer offers to arrange the PED file for you. With the EU declaration you take responsibility for conformity (Article 17(4)). An importer selling under its own name or brand becomes manufacturer (Article 10). Have a Dutch product law lawyer review the offer before you hand over your file.

Is a Dutch importer or customer asking for PED papers? Put your situation to our product law partner in the Netherlands.

Which category and route apply, and do you need a notified body?

You classify the equipment in category I to IV (Article 13), and the category decides the procedure (Article 14). A notified body is involved from category II upwards, not in category I.

CategoryProcedures (Article 14(2))Notified body
IModule Ano
IIModule A2, D1 or E1yes, in each
IIIB+D, B+F, B+E, B+C2 or Hyes
IVB+D, B+F, G or H1yes

You choose one procedure for your category, and may use one for a higher category (Article 14(3)). An assembly follows a global procedure (Article 14(6)). So “PED certification” does not always mean a notified body certificate: in category I it does not.

The technical work (risk analysis, category, module, calculations, tests) is for an engineering firm or notified body, not a lawyer.

What must you mark, keep and supply in the Netherlands?

Unless it falls under Article 4(3), mark the equipment with CE, keep documentation and EU declaration for 10 years, show your name, address and an identifying number, and supply instructions in Dutch. The declaration may be in Dutch or English.

  1. Affix CE visibly, legibly and indelibly to the equipment or its data plate before placing on the market, followed by the notified body’s number if it was involved in production control (Article 19(1), (3) and (4)). The markings of Annex I, point 3.3 also apply.
  2. Give a type, batch or serial number, and your name and postal address (Article 6(5) and (6)).
  3. Draw up the EU declaration (model in Annex IV) and keep it with the technical documentation for 10 years (Articles 6(3), 17).
  4. Supply instructions and safety information in Dutch and the declaration in Dutch or English (Warenwetbesluit drukapparatuur 2016, Article 4(2) and (3)).

The directive leaves the language to the Member State (Article 6(7)): English is not enough for the instructions. An assembly gets one CE marking; items already bearing CE keep theirs (Article 19(2)). Equipment under Article 4(3) follows sound engineering practice, bears no CE marking and needs adequate instructions; the limits are in Article 4(1).

What does your Dutch customer have to arrange, and what does it ask from you?

The Dutch user of designated pressure equipment must have it inspected before first use and after each assembly at a new site, at its own cost, on top of your CE file.

Which equipment is designated is set by ministerial regulation, by table and category, so not all pressure equipment (Warenwetbesluit, Article 21(1); Warenwetregeling drukapparatuur 2016, Article 2). The request goes to a Dutch conformity assessment body or user inspectorate with the instructions (Annex I, point 3.4), including a proof of manufacture (vervaardigingsbewijs), and the EU declaration (Article 21(2) to (4)).

A request for inspection papers often comes at the last moment, because the installation has to run. My first step is not the technical talk but a row of documents: which category and procedure fit your equipment, what is in your EU declaration, which Dutch instructions you supply, and what you have promised in writing. Then I settle who supplies what and who arranges the inspection, and only then do you answer, briefly and factually. A quick answer becomes the yardstick for what you promised.

Note: Your customer’s order says you supply the papers for its inspection before first use. If the declaration, Dutch instructions or proof of manufacture are late or incomplete, the inspection under Article 21 of the Warenwetbesluit stalls; your terms decide who bears that. Have a Dutch product law lawyer review the supply terms before you sign.

How does the Pressure Equipment Directive work in the Netherlands, and who supervises?

For pressure equipment and assemblies the competent authority is the Minister of Social Affairs and Employment, and officials designated by the minister supervise (Warenwet, Articles 1(1)(d) and 25). The Act names no service.

Under the directive the market surveillance authority can require corrective action, withdrawal or recall (Article 40(1)) and, failing that, take provisional measures (Article 40(4)). The minister can also order administrative coercion (last onder bestuursdwang) and impose an administrative fine (Warenwet, Articles 32 and 32a); see sales ban, seizure or fine from a Dutch regulator.

Note: The authority finds the CE marking or notified body number missing or wrong, the declaration missing or wrongly drawn up, or the technical documentation incomplete. That is formal non-compliance: the authority requires you to end it, and if it persists the equipment can be restricted, prohibited or recalled (Article 43). Have a Dutch product law lawyer read the file before you send it to the authority.

What do you do when your customer or a Dutch authority asks for your documents?

Find out who asks, on what basis and by when, then gather your declaration and technical documentation. On a reasoned request you must give the authority all information needed to show conformity (Article 6(9), binding through Article 4(1) of the Warenwetbesluit).

Importers have the same duty (Article 8(9), through Article 6(1) of the Warenwetbesluit), and economic operators must be able to say for 10 years who supplied them and whom they supplied (Article 11). A letter from the Dutch authority can therefore reach you through your importer; if it does, first establish which documents exist and who holds them.

First I look at what exactly is going on. My approach is to repair the file before it becomes a measure, to show the authority what you have put right, and to promise only what you can deliver.

When do you need a Dutch lawyer for the Pressure Equipment Directive?

When there is a counterparty or a risk in the chain: a customer demanding proof, an assembly built on site, an authority with a request, or a partner selling under its own brand.

SituationWhat is at stakeWhat we do first
Customer demands proof or inspection papersyour declaration (Art. 17(4)); inspection (Decree, Art. 21)review terms, set document list
Assembly on site, or customer assembles for own usewho is manufacturer (Art. 2(18), 10, 14(6); Decree, Art. 17a)establish role, set it in contract
Authority asks for documents or finds a defectArt. 6(9); formal non-compliance (Art. 43)read letter, safeguard file and reply
Customer sells under own brand or modifiestreated as manufacturer (Art. 10)fix roles, adapt contract

On assemblies built on site, the Commission’s evaluation of 23 October 2026 finds recital 7 unclear in the provisions, so Member States read it differently (Commission staff working document).

I advise having the agreements on role, documents and inspection checked before the first delivery to a new customer. What you say at the sale decides later who carries a gap in the file, and afterwards such an agreement is hard to make.

My advice: record who orders and builds an assembly, who carries out the global assessment, which documents you supply, and that the customer tells you if it modifies a device or assembles it itself.

Example: an installation built from several suppliers

Agree roles and papers with importer and customer before the first delivery. This hypothetical example shows the gap when nobody does so.

Suppose a manufacturer outside the EU supplies several items to a Dutch importer, which resells them to a customer. The customer’s contractor connects them with equipment from other suppliers into one installation on site, and the customer asks for the papers for its inspection. Each item may carry CE, but who is manufacturer of the whole, and who carries out the global assessment (Article 14(6))?

How does MAAK Advocaten work on pressure equipment files?

MAAK Advocaten in Amsterdam acts for manufacturers, assemblers and importers of pressure equipment, from role analysis to contact with the authority.

We establish your role, review the contracts in your chain, repair the file after a formal non-compliance and, where needed, litigate in first instance and on appeal. We do not classify products, choose modules or calculate.

Frequently asked questions

Does the Pressure Equipment Directive apply to my product, and do I need a notified body?

It applies above 0.5 bar maximum allowable pressure, unless Article 1(2) excludes it. Category I follows Module A without a notified body; categories II to IV involve one in every procedure (Article 14(2)).

What must my Dutch customer arrange?

For designated equipment, the user must have it inspected before first use, at its own cost, and asks you for instructions and EU declaration (Warenwetbesluit, Article 21).

What does the authority do in the Netherlands if my product is checked?

The Dutch market surveillance authority can require corrective action, withdrawal or recall (Article 40(1)); a continuing formal non-compliance can lead to restriction or recall (Article 43).

When should I call a Dutch lawyer about the Pressure Equipment Directive?

Have a Dutch product law lawyer review your file and contracts before the first delivery to a new customer, and when an authority or customer asks for proof.

Legal framework and sources

About the author. Martin Krüger is a Dutch product compliance attorney (advocaat) and partner at MAAK Advocaten. His areas include CE marking and product regulation. · Profile

Is a Dutch customer or authority asking about your PED file? Put your situation to our product law partner in the Netherlands, or contact Martin Krüger.

News & Insights
Which topics would you like to receive updates on?
Who are you?
Which industry or sector do you operate in? (Optional)